Please ensure Javascript is enabled for purposes of website accessibility

The Village of Algonquin, IL

Welcome to the website for the Village of Algonquin!

Water Softener Permit Application Checklist

Submittal Requirements:
Permit Fees (Fee is not due until permit is ready):
  • New Install: $45.00
  • Replacement: $10.00
Construction Requirements & Information:
  • Work must be started and completed within six (6) months of the issue date.
  • The softener must be hard piped.
  • The drain line must be piped through an air gap device.
  • There needs to be an outlet within reach of the factory installed power cord. (Extension cords are not permitted.)
  • After Permit is issued, as construction progresses, inspections are required. Click here to schedule inspections online. Or call us at (847) 658-2700, option 3.
Adopted BUILDING CODES:

International Residential Code 2018  |  International Building Code 2018  | International Fire Code 2018  |  International Mechanical Code 2018  |  International Fuel Gas Code 2018  |  National Electrical Code 2017  |  Current Illinois State Plumbing Code  |   International Energy Conservation Code 2018  |  International Existing Building Code 2018  |  International Property Maintenance Code 2018  |  Illinois Accessibility Code 2018

Please note that this checklist is not intended to be all-inclusive. Due to changes in codes, regulations, and ordinances, other requirements may apply.

For further information regarding the Village's regulations for building permits, please contact the Community Development Department at 847-658-2700, press 3 or email at permits@algonquin.org or submit Online form.