Please ensure Javascript is enabled for purposes of website accessibility

The Village of Algonquin, IL

Welcome to the website for the Village of Algonquin!

Village Construction Projects - In Construction - Dixie Creek Reach 5

The Village of Algonquin will begin the Dixie Creek Reach 5 Rehabilitation Project in Summer 2024, with an expected completion by Fall 2025, weather permitting. This project will rehabilitate Reach 5 of Dixie Creek through streambank stabilization and ecological restoration. The work will be performed in coordination with the Braewood Lift Station improvement project.

Project Overview:

  • Restoration of 700 linear feet of Dixie Creek
  • Repairing and reinforcing eroded banks to enhance creek stability
  • Naturalization of streambank with native plantings

Please exercise caution in the work zone. Emergency vehicle access will be maintained throughout the construction period.

Project Area:

  • Reach 5 of Dixie Creek, south of Gaslight Drive, between Spring Hill Drive and Braewood Drive

Contact:

Brad Andresen
Ecologist/Horticulturist
Email: bradleyandresen@algonquin.org